​If you are in the construction business, the Kearney Builders Bureau is an inexpensive way to keep informed of new construction projects in the area. This service is available for Chamber Members at an annual cost of $50. As a member of our Builders Bureau you will be able to access a library of blueprints that you can borrow for a 24-hour period or receive digital copies of plans that are received. For more information on our Kearney Builders Bureau, please contact Stacey Johnson. 

7.png

NEBRASKA ARMY NATIONAL GUARD - (GREENLIEF TRAINING SITE) BUILDING 706 CONSTRUCTION

Hastings, NE

Addendum: #1 added 7/2/2020, #2 added 07/02/2020

Bid Date: July 7, 2020 @ 1:30 P.M.

Plan Type: Digital

Project Description: The work covered by this Statement of Work consists of all labor, equipment, tools, materials, travel, licenses and permits to construct a 6000 Gross SF General Instruction Building at the Greenlief Training Site, in Hastings, Nebraska. Project to include new climate controlled metal framed structure (approximately 75' x 80' one story facility) which can incorporate several multi-functional classrooms, designed with flexible use spaces, common space area, male and female latrines, associated plumbing, water lines and sanitary sewer alterations, a sealed floor, mechanical room, HVAC, and insulation, drywall. interior finishes and electrical throughout.

CENTRAL COMMUNITY COLLEGE - COLUMBUS - CENTER FOR SCIENCE AND TECHNOLOGY

Columbus, NE

Addendum:

Bid Date: July 21, 2020 @ 2:00 P.M.

Plan Type: Physical

Project Description: The work consists of a new addition and interior remodel at the existing East Education Building on the Central Community College - Columbus Campus. Remodel is approximately 11,700 sq. ft. and includes restrooms, faculty offices, a technology lab and classroom spaces. Demolition consists of existing restrooms, carpet, ceilings, doors concrete, and associated mechanical and electrical devices. The new addition is approximately 23,000 sq. ft. and is slab-on-grade with precast wall panels, curtain wall openings/entrance and EPDM roof. Interior includes metal stud framing, gypsum wall board, carpet tile, porcelain tile, ceilings, wall and floor tile, architectural casework, laboratory casework, hollow metal doors and frame, aluminum storefront doors, plumbing fixtures, mechanical equipment, LED light fixtures, A/V equipment, and associated life safety equipment and devices.

HASTINGS CHARGE POINT STATION - CENTRAL COMMUNITY COLLEGE

Hastings, NE

 

Addendum:

Bid Date: July 21, 2020 @ 2:00 P.M.

Plan Type: Digital

Project Description: Central Community College is requesting bids to install and connect an owner-furnished electric vehicle charging station on the Hastings Campus.

PHELPS BUILDING BOILER REPLACEMENT - CENTRAL COMMUNITY COLLEGE

Hastings, NE

Addendum:

Bid Date: July 21, 2020 @ 2:30 P.M.

Plan Type: Digital

Project Description: Central Community College is requesting bids to replace the existing boiler and associated mechanical systems at the Phelps Building on their Hasting Campus.

NEBRASKA ARMY NATIONAL GUARD - (GREENLIEF TRAINING SITE) EAST ROCA FIRE TRUCK BAY ADDITION

Hastings, NE

Addendum:

Bid Date: July 23, 2020 @ 1:30 P.M.

Plan Type: Digital

Project Description: The work covered by (SOW) consists of all labor, equipment, tools, materials, travel, licenses and permits to construct a 2355 Gross SF building addition to building #06015 (Range Support Bldg, East ROCA), built in 2018 at the Greenlief Training site, in Hastings, NE. This 47' x 50' building addition to be erected of a steel-framed and steel-covered construction with design configuration that will allow for drive though capabilities including 12'X12' Overhead Doors. The fire truck ready bays addition will be to house Fire Trucks and will have independent heat, insulated, have a 6" concrete floor, and overhead doors of sufficient size for the fire trucks, equipment and apparatus.

NEBRASKA ARMY NATIONAL GUARD - (GREENLIEF TRAINING SITE) ASP SIRE BUILDING

Hastings, NE

Addendum:

Bid Date: July 30, 2020 @ 1:30 P.M.

Plan Type: Digital

Project Description: This project consists of all labor, equipment, tools, materials, travel, licenses and permits for the construction of a new Ammunition Supply Point SIRE Building at the Greenlief Training Site, Hastings, NE. The 3,500 SF metal clad insulated building will include an administrative space, latrine, ammunition inspection and storage areas with overhead doors. Utilities required to be installed include electrical, HVAC, water and sewer, and communications. Project to be substantially complete not later than 280 days from the Notice to Proceed Letter.

NDOT - GERING WASH BAY ADDITION

Gering, NE

Addendum:

Bid Date: July 30, 2020 @ 3:00 P.M.

Plan Type: Digital

Project Description: The project includes the addition of a drive through vehicle wash bay to the south end of the existing vehicle bays at the Gering District 5 Headquarters Facility. Work will include a prefabricated metal building structure, wall and roof panels, overhead doors, new interior and exterior lighting, related plumbing, heating and gas lines, as well as extended fire sprinkler system. Exterior work will include additional concrete paving.

NEBRASKA ARMY NATIONAL GUARD - (GREENLIEF TRAINING SITE) BUILDING 610 ADDITION

Hastings, NE

 

Addendum:

Bid Date: August 6, 2020 @ 1:30 P.M.

Plan Type: Digital

Project Description: This addition project includes all labor, equipment, tools, materials, travel, lifts, licenses & permits required to construct an approx. 900 SF addition to the south end of Bldg 610 (Built in 1985) to create a vestibule, a laundry room, and a day room, with exit doors and sidewalks on the East and West sides of the vestibule. Installation of a fire sprinkler system that is tied into the existing system in Bldg 610. Landscaping to including sodding and sprinkler system. Project is estimated to take 210 days from Notice to Proceed (NTP approx 27 Aug 2020.)

NEBRASKA ARMY NATIONAL GUARD - (GREENLIEF TRAINING SITE) BUILDING 620 ADDITION

Hastings, NE

 

Addendum:

Bid Date: August 6, 2020 @ 1:30 P.M.

Plan Type: Digital

Project Description: This addition project includes all labor, equipment, tools, materials, travel, lifts, licenses & permits required to construct an approx. 900 SF addition to the south end of Bldg 620 (Built in 1985) to create a vestibule, a laundry room, and a day room, with exit doors and sidewalks on the East and West sides of the vestibule.

Installation of a fire sprinkler system that is tied into the existing system in Bldg 620. Landscaping to include sodding and sprinkler system.
Project is estimated to take 210 days from Notice to Proceed (NTP approx 27 Aug 2020).